MAIN SANCTUARY RENOVATION UPDATE: As of 3/25/07 |
||||||||||||||||||
| The lower stained glass windows have been installed in the main sanctuary. | ||||||||||||||||||
| As of 8/20/06 | ||||||||||||||||||
![]() |
||||||||||||||||||
| The new frame along with the outer protective glass of all the windows have been installed in the main sanctuary. | ||||||||||||||||||
![]() |
||||||||||||||||||
| The surface of the main sanctuary floor has been leveled in preparation for the laying of new tiles. | ||||||||||||||||||